Solving Space Constraints with Bespoke Fuel Infrastructure Design.
Managing Space Constraints with Bespoke Infrastructure - (Tesco Forecourt, Shoreham)
Old steel pipework removed for over 1.5 kilometres of
composite dual contained pipe from PLX, partnered with Berrys own Retro
chambers, to cover 13 new tank lids. Above the surface came a new installation
of a 7 fill and vent, to feed the pipelines using both 4 and 3-inch CAM
adaptors.